I am working on a design for a project in Texas for which we are considering a PT slab above grade 10" - 12"... haven't decided yet if this is a good approach, but wanted to ask if that may be a reasonable approach for your design? The answer will depend on several variables, including the spacing of the APG piles. The reason we may use a PT slab is the same as your case... expansive soils. Our site appears to have only slightly expansive soil... we may end up over-excavating 2'-3' and replacing with select structural fill to reduce swell potential. Bruce D. Holcomb, PE Butler, Rosenbury & Partners 300 S. Jefferson, Suite 505 Springfield, MO 65806-2217 ph (417) 865-6100 fax (417) 865-6102 -----Original Message----- From: Michael Hemstad [mailto:mlhemstad(--nospam--at)yahoo.com] Sent: Wednesday, June 04, 2003 1:31 PM To: seaint(--nospam--at)seaint.org Subject: augered piles I have a project in Texas with a large concrete slab supported on auger-cast piling, lots of them, going down about 25 feet to limestone. Due to expansive clays, I have potential uplift. I am resisting this, or trying to, using a high-strength (Dywidag or Williams) threadbar drilled and grouted into the underlying rock. To install these, a plugged pipe (about 4 inch diameter) will be pushed down the middle of the pile before the grout sets. Then, a few days later, the driller will drop a rock drill down the pipe and drill down into the rock. The bar will be dropped in and grouted full length. My question is, should I take the opportunity to pretension this bar? The potential uplift is a good deal more than the dead load, and probably greater than the tension capacity of the grout. It means two-stage grouting of the bar, and the cost of the jacking, so it's not free, but not too expensive. Any opinions? Thanks, Mike Hemstad TKDA St. Paul, Minnesota __________________________________ Do you Yahoo!? Yahoo! Calendar - Free online calendar with sync to Outlook(TM). http://calendar.yahoo.com ******* ****** ******* ******** ******* ******* ******* *** * Read list FAQ at: http://www.seaint.org/list_FAQ.asp * * This email was sent to you via Structural Engineers * Association of Southern California (SEAOSC) server. To * subscribe (no fee) or UnSubscribe, please go to: * * http://www.seaint.org/sealist1.asp * * Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you * send to the list is public domain and may be re-posted * without your permission. Make sure you visit our web * site at: http://www.seaint.org ******* ****** ****** ****** ******* ****** ****** ******** ******* ****** ******* ******** ******* ******* ******* *** * Read list FAQ at: http://www.seaint.org/list_FAQ.asp * * This email was sent to you via Structural Engineers * Association of Southern California (SEAOSC) server. To * subscribe (no fee) or UnSubscribe, please go to: * * http://www.seaint.org/sealist1.asp * * Questions to seaint-ad(--nospam--at)seaint.org. Remember, any email you * send to the list is public domain and may be re-posted * without your permission. Make sure you visit our web * site at: http://www.seaint.org ******* ****** ****** ****** ******* ****** ****** ********
- Prev by Subject: RE: augered piles
- Next by Subject: augered piles
- Previous by thread: RE: augered piles
- Next by thread: augered piles
- About this archive
- Messages sorted by: [Subject][Thread][Author][Date]